Monitoring of Ecological Systems of the Tâmega Electric Production System
Coordinator:
Joaquim José Barreira de Jesus
The Monitoring Plan drawn up for the Tâmega Electrical Production System results from the need to evaluate the impacts resulting from the project implementation on the surrounding fauna and flora, as well as to carry out long-term monitoring of each of the compensation measures, evaluating the state of conservation and effectiveness of structures created or installed in improving habitat, flora and fauna in the area of operation.
Project Details
Reference
7180/ET-00339
Status
Running
Start date
April 2023
Duration
60 months
Funding Entity
IBERDROLA
Total Financing
3.098.013,67€
CITAB/UTAD Financing
3.098.013,67€