Services Projects

110
Total
107
National
2
European
1
International
Monitoring of Ecological Systems of the Tâmega Electric Production System
Running

Coordinator  /  Joaquim Jesus
Start date  /  2023/04 Funding  /  IBERDROLA Reference  /  7180/ET-00339


Integrated Environmental Monitoring Program for Baixo Sabor Hydroelectric exploitation (PIMA AHBS)
Running

Coordinator  /  Joaquim Jesus
Start date  /  2023/01 Funding  /  EDP/MOVHERA Reference  /  RC 30000113


Integrated Environmental Monitoring Program for Foz Tua Hydroelectric exploitation (PIMA AHFT)
Running

Coordinator  /  Joaquim Jesus
Start date  /  2023/01 Funding  /  EDP/MOVHERA Reference  /  RC 30000113


Monitoring the effectiveness and optimization of the Belver dam fish lock
Running

Coordinator  /  Joaquim Jesus
Start date  /  2022/01 Funding  /  EDP Reference  /  SINERGIE N.º 900960122


Hydroelectric exploitation of Foz Tua River Valey (AHFT) - Integrated Environmental Monitoring Programme (PIMA), Exploration Phase (SINERGIE process n.º 008011219)
Running

Coordinator  /  Joaquim Jesus
Start date  /  2020/09 Funding  /  EDP – Gestão da Produção de Energia, S.A. Reference  /  Processo SINERGIE n.º 008011219


TranCastNut - Contribution to the development of the chestnut value chain in the municipality of Trancoso
Running

Coordinator  /  José Laranjo
Start date  /  2019/01 Funding  /  Municipality of Trancoso


Survey of existing avifauna along the strecht of PR7 MCNAMT-villages and margins of rio Ovelha
Concluded

Coordinator  /  João Cabral
Start date  /  2020/11 Funding  /  Orçamento Participativo Jovem 2020 Reference  /  97/2020


Elaboration of forty management plans for natural habitats, wild fauna and flora, which focus on 13 Sites of Community Importance (SCI) under the Habitats Directive - Descriptor Terrestrial and Inland Water Vertebrates (POSEUR-03-2215-FC-000005)
Concluded

Coordinator  /  João Cabral
Start date  /  2020/03 Funding  /  POSEUR Reference  /  POSEUR-03-2215-FC-000005


Acoustic inventory, search for shelters and capture, within the scope of the review of the Red Book of Mammals of Portugal mainland
Concluded

Coordinator  /  João Cabral
Start date  /  2019/08 Funding  /  POSEUR Reference  /  POSEUR-15-2018-17


Review of the Red Book of Birds of Portugal mainland (Action 3 (T03), Lots I and II)
Concluded

Coordinator  /  João Cabral
Start date  /  2019/05 Funding  /  POSEUR Reference  /  POSEUR-03-2215-FC-000093


Elaboration of twenty plans for the management of natural habitats, wild fauna and flora for protected areas (SIC) - Terrestrial and Inland Aquatic Vertebrates
Concluded

Coordinator  /  João Cabral
Start date  /  2018/03 Funding  /  FLORADATA – BIODIVERSIDADE, AMBIENTE E RECURSOS NATURAIS LDA e TERRITÓRIO XXI – GESTÃO INTEGRADA DO TERRITÓRIO E DO AMBIENTE LDA


Hydroelectric exploitation of Foz Tua River Valey (AHFT) - Integrated Environmental Monitoring Programme (PIMA) (86/17/DST)
Concluded

Coordinator  /  João Cabral
Start date  /  2017/10 Funding  /  EDP – Gestão da Produção de Energia, S.A. Reference  /  86/17/DST


Study Case about the Pedrogão Grande and Góis wildfires
Concluded

Coordinator  /  José Miguel Cardoso Pereira UTAD/CITAB Coordinator  /  Paulo Fernandes
Start date  /  2017/09 Funding  /  Observador


Porto mountain range Park - preliminar studies and management plan
Concluded

Coordinator  /  Teresa Andresen UTAD/CITAB Coordinator  /  Paulo Fernandes
Start date  /  2017/07


Monitoring of avifauna and bats in the over-equipping of the Alto do Marco wind farm in the pre-construction phase
Concluded

Coordinator  /  João Cabral
Start date  /  2017/04 Funding  /  Parque Eólico de Gevancas


Trabalhos de monitorização de avifauna e quirópteros no sobreequipamento do parque eólico do Vale da Azinheira na fase prévia à construção
Concluded

Coordinator  /  João Cabral
Start date  /  2017/04 Funding  /  Parque Eólico do Vale do Abade


Trabalhos de monitorização de avifauna e quirópteros no sobreequipamento do parque eólico de D. João e Feirão na fase prévia à construção.
Concluded

Coordinator  /  João Cabral
Start date  /  2017/04 Funding  /  Empreendimentos Eólicos do Douro, SA.


Monitorização da atividade e prospeção da mortalidade de quirópteros e de avifauna no Parque Eólico de Gevancas II
Concluded

Coordinator  /  João Cabral
Start date  /  2017/03 Funding  /  Parque Eólico de Gevancas


Baixo Sabor Hydroelectric Dam (AHBS) - Integrated Environmental Monitoring Program (PIMA), Exploitation Phase (75/17/DST)
Concluded

Coordinator  /  João Cabral
Start date  /  2017/01 Funding  /  EDP – Gestão da Produção de Energia, S.A. Reference  /  75/17/DST


Monitorization of the state of water bodies respecting rivers and reservoirs under the Water Framework Directive
Concluded

Coordinator  /  Rui Cortes
Start date  /  2017/01


Development of management plans of natural habitats, wild fauna and flora, focusing on Sites of Community Importance (SIC) under the Habitats Directive
Concluded

Coordinator  /  Rui Cortes
Start date  /  2017/01 Funding  /  Agência Portuguesa de Ambiente


Levantamento e Caracterização de Habitats e Biodiversidade do rio Almonda
Concluded

Coordinator  /  João Cabral
Start date  /  2016/02 Funding  /  Câmara Municipal de Torres Novas Reference  /  (REF. 2160/15 – DAES/AP)


TranCast
Concluded

Coordinator  /  José Gomes Laranjo UTAD/CITAB Coordinator  /  José Laranjo
Start date  /  2015/06 Reference  /  TranCast


Aguiar CIV - Cooperation protocol between UTAD, City Hall of Aguiar da Beira, the Union of Parishes of Aguiar da Beira and Coruche, and ARVOFRITI-Árvore de Frutas Lda., for the Installation of the Living Interpretation Center of Castanheiro and Chestnut Aguiar da Beira
Concluded

Coordinator  /  José Laranjo
Start date  /  2015/02 Reference  /  Aguiar CIV


Aproveitamento Hidroeléctrico do Baixo Sabor (AHBS) – Programa Integrado de Monitorização Ambiental (PIMA)
Concluded

Coordinator  /  João Cabral
Start date  /  2015/01 Funding  /  EDP – Gestão da Produção de Energia, S.A. Reference  /  PRT-2015-00715


Requalificação do Freixo d’Armas – Contributo para a Preservação, Valorização e Divulgação.
Concluded

Coordinator  /  Luís Martins
Start date  /  2015/01 Funding  /  CÂMARA MUNICIPAL DE FREIXO DE ESPADA À CINTA Reference  /  Requalificação do Freixo d’Armas


Inventário e avaliação da fitossanidade das árvores da Guarda
Concluded

Coordinator  /  Luís Martins
Start date  /  2014/09 Funding  /  Câmara Municipal da Guarda


Caracterização ambiental do Pedras Salgadas SPA & Nature Park e no Hotel Vidago Palace.
Concluded

Coordinator  /  João Cabral
Start date  /  2014/06 Funding  /  BirdWatching, Portugal


ErgoCast
Concluded

Coordinator  /  José Gomes Laranjo UTAD/CITAB Coordinator  /  José Laranjo
Start date  /  2014/04 Reference  /  ErgoCast


Caraterização da situação ecológica de referência do Vale do Bestança, no que respeita à fauna e flora existente
Concluded

Coordinator  /  João Cabral
Start date  /  2014/03 Funding  /  Câmara Municipal de Cinfães